Model and materials
Match the item code and SKU, frame and shaft materials, construction and specification to ensure quotes, samples and inspection records refer to the same model.
RACKET QUALITY / VERIFICATION · 03
Make each step traceable, from the SKU specification to bulk-order acceptance. Define inspection scope in writing for the exact model and order, for both badminton and tennis racket projects.
SUPPLIER PROCESS / PAILANGQC / 01BUYER INSPECTION CHECKLIST
Build a checklist for each target model. These are recommended checks, not claims of existing test reports or certifications.
Match the item code and SKU, frame and shaft materials, construction and specification to ensure quotes, samples and inspection records refer to the same model.
Check overall length, weight and tolerance, balance, shaft flexibility and grip size against the agreed basis; record the measuring tool and method.
Inspect for frame cracks, joints, grommets, finish and shaft connections. Define defect categories and acceptance criteria in advance.
Confirm string model, gauge, color, pre-stringing, tension and measurement method, plus grip size, wrap and included accessories.
Compare artwork, colors, string-marking position and finish with the approved proof; use the approved sample as the visual reference for bulk.
Check quantities, accessories, labels, inner and outer packaging, and carton marks by SKU. Record lot identification and packing details.
PRODUCTION STAGES / VISUAL GUIDE
These visuals help buyers discuss common racket-making steps. Verify actual methods, equipment and work practices with the specific supplier.
Confirm string type, stringing pattern and the agreed tension measurement basis.
Compare frame finish, joints and configuration with the approved sample.
Confirm grip size, wrapping and assembly requirements for each model.
Images are from the Pailang supplier page on Alibaba.com and are shown as process references. They do not establish a FeatherArc-owned factory or verified quality procedures; permission to use them requires confirmation.
INSPECTION PROCESS / PROJECT BASIS
Agree on the inspection scope, responsible party, sampling, acceptance criteria and nonconformance handling in writing before ordering.
Put the SKU, specifications, tolerances, appearance, packaging and acceptance rules into one confirmation sheet.
Check the physical model, measurement basis, configuration and artwork; keep the mutually approved sample photos and version.
Agree on timing, quantity or sampling rate, check items, decision rules and handling of defects. If third-party inspection is needed, confirm the provider, scope and cost first.
Review batch records, photos, packaging and quantities against the agreement. Document deviations and their disposition before release under the agreed order terms.
AGREE THE RULES / BEFORE INSPECTION
This page is a buyer's checklist. It does not establish that a supplier has promised specific testing capabilities, sampling standards or defect remedies.
Confirm whether checks are performed by the supplier, buyer or a third party, and who provides reports and source records.
INSPECTOR · DATE · RECORD OWNERSpecify sample quantity or ratio, measurement method, defect categories and acceptance criteria. Do not assume an unagreed sampling level.
SAMPLE SIZE · METHOD · CRITERIAAgree on reinspection, rework, replacement or another remedy, including responsibility, timing and written sign-off.
NONCONFORMANCE · REMEDY · OWNERPROJECT DOCUMENTS TO REQUEST
A document supports a quality claim only when its issuing entity, sample identity and scope match the purchase under review.
List item code, SKU, materials, dimensions, weight basis, tolerances and order configuration.
Check model match, measurement basis and revision traceabilityKeep the confirmed sample version, logo files, colors and accessory list in writing.
Check approval date, revision and applicable orderRequest the inspection date, lot ID, sample quantity, results, nonconformances and supporting photos.
Check batch link, inspection scope, results and resolutionVerify issuer, report number and date, sample model, test items and scope. Do not substitute a document for another model or entity.
Check issuer, validity, sample model and test scopeThe page does not claim a specific certification or inspection capability. Verify documents supplied for the responsible entity, target model and order before making a public claim.
Need help confirming model-specific inspection documents? Contact the project team
BEFORE ORDERING
When contacting the project team, share the racket type, target SKU, order quantity and destination market so the checklist can be prepared for your project.